The HZ Ribbon Pontoon Bridge is a high-efficiency temporary floating crossing solution engineered to quickly establish stable water passages. It excels in building 60t floating bridges and versatile ferries (40t, 60t, 110t capacity) for rivers with a maximum flow velocity of 2.5m/s, delivering fast, reliable access for vehicles and equipment in time-sensitive scenarios.
Designed to address the need for rapid, temporary water crossings, the HZ Ribbon Pontoon Bridge eliminates delays associated with traditional fixed crossings. Unlike rigid bridge systems that require extensive setup or external support, this ribbon-style pontoon solution combines speed and flexibility—capable of transitioning between floating bridges and multiple ferry configurations to match diverse load and operational needs. Its compatibility with rivers up to 2.5m/s flow velocity ensures adaptability across most inland waterways, making it a go-to choice for emergency response, construction, and military operations where quick access is critical.
Type of Floating Bridge: 60t Capacity
Maximum Tracked Load: 60t
Maximum Axle Load: 13t
Roadway Width: 6.5m
Maximum Length: 109m
Personnel Required: 32 operators + 21 transporter drivers + 10 motor boat personnel
Deployment Time: 18min
Load Capacity: 40t
Roadway Width: 6.5m
Bays Required: 2 Interior Bays + 0 Ramp Bays
Ferry Length: 15.5m
Assembleable Quantity: 7 units
Personnel Required: 4 (for Interior Bays) + 2 (for Ramp Bays)
Assembly Time: 8min
Load Capacity: 60t
Roadway Width: 6.5m
Bays Required: 3 Interior Bays + 0 Ramp Bays
Ferry Length: 20.2m
Assembleable Quantity: 4 units
Personnel Required: 6 (for Interior Bays) + 3 (for Ramp Bays)
Assembly Time: 10min
Load Capacity: 110t
Roadway Width: 6.5m
Bays Required: 5 Interior Bays + 1 Ramp Bay
Ferry Length: 39.2m
Assembleable Quantity: 2 units
Personnel Required: 12 (for Interior Bays) + 6 (for Ramp Bays)
Assembly Time: 13min
What makes the HZ Ribbon Pontoon Bridge a standout floating crossing solution?
Ultra-Fast Deployment: Completes a 60t floating bridge (109m max length) in just 18min; ferries assemble in 8–13min—critical for time-sensitive missions.
Multi-Load Versatility: Supports 60t floating bridges and three ferry capacities (40t, 60t, 110t) to handle light-to-heavy vehicles/equipment.
Uniform Spacious Roadway: Consistent 6.5m roadway width across all configurations, ensuring compatibility with most standard and heavy-duty vehicles.
Clear Personnel Allocation: Detailed, role-specific personnel requirements (operators, drivers, motor boat staff) simplify workforce planning and training.
Strong Current Adaptability: Operates reliably in rivers with flow velocities up to 2.5m/s, suitable for diverse inland waterway conditions.
The HZ Ribbon Pontoon Bridge is tailored for scenarios requiring rapid, temporary water access:
Emergency Response: Enables quick deployment of rescue teams, vehicles, and supplies across rivers during floods, earthquakes, or natural disasters.
Infrastructure Construction: Supports cross-river construction projects (e.g., dam building, pipeline installation) by connecting work sites for heavy machinery.
Military Operations: Facilitates swift movement of troops, armor, and logistics across waterways in dynamic operational environments.
Temporary Traffic Replacement: Acts as a backup crossing when permanent bridges are damaged, under maintenance, or unavailable.
Speed as a Competitive Edge: 18min floating bridge deployment and 8min ferry assembly outpace traditional temporary crossing systems.
Load Flexibility: Three ferry options + a 60t floating bridge cover nearly all light-to-heavy crossing needs with one system.
Operational Clarity: Defined personnel roles and assembly times reduce coordination errors and streamline on-site execution.
Environmental Adaptability: 2.5m/s current tolerance ensures performance in most non-extreme river conditions, expanding its usable range.