TO SERVE AS A SOLID FOUNDATION FOR GLOBAL CUSTOMERS'
MILITARY AND LOGISTICAL SUPPORT OPERATIONS DEMANDS
  • 1/4
Previous
The HZ Power Pontoon Bridge is a versatile floating crossing system engineered for rapid deployment on rivers with current velocities up to 2.5m/s. Equipped with its own power system, it not only establishes stable floating bridges but also enables the construction of various ferry configurations, delivering flexible and efficient water-crossing capabilities for diverse operational needs.
Inquiry
Detail

1. Hero Section: Core Value Overview

The HZ Ribbon Pontoon Bridge is a high-efficiency temporary floating crossing solution engineered to quickly establish stable water passages. It excels in building 60t floating bridges and versatile ferries (40t, 60t, 110t capacity) for rivers with a maximum flow velocity of 2.5m/s, delivering fast, reliable access for vehicles and equipment in time-sensitive scenarios.

2. Product Introduction

Designed to address the need for rapid, temporary water crossings, the HZ Ribbon Pontoon Bridge eliminates delays associated with traditional fixed crossings. Unlike rigid bridge systems that require extensive setup or external support, this ribbon-style pontoon solution combines speed and flexibility—capable of transitioning between floating bridges and multiple ferry configurations to match diverse load and operational needs. Its compatibility with rivers up to 2.5m/s flow velocity ensures adaptability across most inland waterways, making it a go-to choice for emergency response, construction, and military operations where quick access is critical.

3. Technical Specification

Floating Bridge Construction (One Set)

  • Type of Floating Bridge: 60t Capacity

  • Maximum Tracked Load: 60t

  • Maximum Axle Load: 13t

  • Roadway Width: 6.5m

  • Maximum Length: 109m

  • Personnel Required: 32 operators + 21 transporter drivers + 10 motor boat personnel

  • Deployment Time: 18min

Ferry Raft Assembly

40t Ferry

  • Load Capacity: 40t

  • Roadway Width: 6.5m

  • Bays Required: 2 Interior Bays + 0 Ramp Bays

  • Ferry Length: 15.5m

  • Assembleable Quantity: 7 units

  • Personnel Required: 4 (for Interior Bays) + 2 (for Ramp Bays)

  • Assembly Time: 8min

60t Ferry

  • Load Capacity: 60t

  • Roadway Width: 6.5m

  • Bays Required: 3 Interior Bays + 0 Ramp Bays

  • Ferry Length: 20.2m

  • Assembleable Quantity: 4 units

  • Personnel Required: 6 (for Interior Bays) + 3 (for Ramp Bays)

  • Assembly Time: 10min

110t Ferry

  • Load Capacity: 110t

  • Roadway Width: 6.5m

  • Bays Required: 5 Interior Bays + 1 Ramp Bay

  • Ferry Length: 39.2m

  • Assembleable Quantity: 2 units

  • Personnel Required: 12 (for Interior Bays) + 6 (for Ramp Bays)

  • Assembly Time: 13min

4. Key Features (Core Advantages)

What makes the HZ Ribbon Pontoon Bridge a standout floating crossing solution?

  • Ultra-Fast Deployment: Completes a 60t floating bridge (109m max length) in just 18min; ferries assemble in 8–13min—critical for time-sensitive missions.

  • Multi-Load Versatility: Supports 60t floating bridges and three ferry capacities (40t, 60t, 110t) to handle light-to-heavy vehicles/equipment.

  • Uniform Spacious Roadway: Consistent 6.5m roadway width across all configurations, ensuring compatibility with most standard and heavy-duty vehicles.

  • Clear Personnel Allocation: Detailed, role-specific personnel requirements (operators, drivers, motor boat staff) simplify workforce planning and training.

  • Strong Current Adaptability: Operates reliably in rivers with flow velocities up to 2.5m/s, suitable for diverse inland waterway conditions.

5. Application Areas

The HZ Ribbon Pontoon Bridge is tailored for scenarios requiring rapid, temporary water access:

  • Emergency Response: Enables quick deployment of rescue teams, vehicles, and supplies across rivers during floods, earthquakes, or natural disasters.

  • Infrastructure Construction: Supports cross-river construction projects (e.g., dam building, pipeline installation) by connecting work sites for heavy machinery.

  • Military Operations: Facilitates swift movement of troops, armor, and logistics across waterways in dynamic operational environments.

  • Temporary Traffic Replacement: Acts as a backup crossing when permanent bridges are damaged, under maintenance, or unavailable.

6. Why Choose the HZ Ribbon Pontoon Bridge?

  • Speed as a Competitive Edge: 18min floating bridge deployment and 8min ferry assembly outpace traditional temporary crossing systems.

  • Load Flexibility: Three ferry options + a 60t floating bridge cover nearly all light-to-heavy crossing needs with one system.

  • Operational Clarity: Defined personnel roles and assembly times reduce coordination errors and streamline on-site execution.

  • Environmental Adaptability: 2.5m/s current tolerance ensures performance in most non-extreme river conditions, expanding its usable range.