TO SERVE AS A SOLID FOUNDATION FOR GLOBAL CUSTOMERS'
MILITARY AND LOGISTICAL SUPPORT OPERATIONS DEMANDS
HZ Elevated Pontoon Bridge is a new type of river - crossing equipment. It enables heavy equipment and vehicles to quickly cross large and medium - sized rivers with high - velocity obstacles, and its technical performance has reached the international advanced level.
Inquiry
Detail

1. Hero Section: Core Value Overview

The HZ Elevated Pontoon Bridge represents a cutting-edge river-crossing equipment designed to enable rapid transit for heavy machinery and vehicles across large and medium-sized rivers—even in challenging conditions with high-velocity currents. With its advanced technical performance meeting international standards, it delivers reliable, efficient river-crossing capabilities for critical operations.

2. Product Introduction

As an innovative river-crossing solution, the HZ Elevated Pontoon Bridge addresses the challenge of moving heavy equipment and vehicles across waterways with strong currents. Unlike conventional river-crossing methods that are slow or limited by water conditions, this system combines speed, durability, and adaptability to provide a robust transit route. Its technical excellence positions it among the world’s leading river-crossing technologies, making it ideal for scenarios where timely, safe river crossing is mission-critical.

3. Technical Specification

Floating Bridge

  • Roadway Width: 4.5m

  • Erection Time: 25min

  • Tracked Load: 60t

  • Axle Load: 13t

  • Operators Required: 26

  • Erection Time for Anchor Ferries: 15min

  • Operators for Anchor Ferries: 16

  • Erection Time for 100m Pontoon Bridge: 40min

  • Operators for 100m Pontoon Bridge: 36

  • Maximum Current Velocity Tolerance: 3.5m/s

Ferry

  • Load Capacity: 120t

  • Full-load Speed: 12km/h

  • No-load Speed: 14km/h

  • Erection Time: 25min

  • Operators Required: 26

4. Key Features (Core Advantages)

What sets the HZ Elevated Pontoon Bridge apart as a premier river-crossing solution?

  • Rapid Deployment: Achieves full erection in as little as 25 minutes (floating bridge) and 40 minutes for a 100m span, minimizing operational delays.

  • High Load-Bearing Capacity: Supports tracked loads up to 60t (bridge) and 120t (ferry), accommodating heavy machinery, trucks, and equipment.

  • Strong Current Resistance: Operates efficiently in currents up to 3.5m/s, ensuring reliability in challenging river conditions.

  • Dual Functionality: Integrates both floating bridge and ferry capabilities, offering flexible crossing options for diverse operational needs.

  • Optimized Manpower Usage: Streamlined operations require as few as 16 operators (anchor ferries) to 36 operators (100m bridge), balancing efficiency with workforce requirements.

5. Application Areas

The HZ Elevated Pontoon Bridge is engineered for scenarios demanding rapid, reliable river crossing. Key use cases include:

  • Military Operations: Enabling swift movement of troops, armor, and supplies across waterways in dynamic environments.

  • Emergency Response: Facilitating disaster relief efforts by connecting communities separated by rivers during floods or crises.

  • Infrastructure Construction: Supporting large-scale projects (e.g., dam building, bridge construction) by providing temporary access across rivers.

  • Disaster Recovery: Restoring critical transit routes after natural disasters damage permanent bridges.

6. Why Choose the HZ Elevated Pontoon Bridge?

  • International-Grade Performance: Meets global technical standards, ensuring reliability and compatibility with international operations.

  • Adaptability to Extreme Conditions: Designed to function in high-velocity currents, making it suitable for diverse river environments worldwide.

  • Time-Efficient Operations: Rapid erection minimizes downtime, a critical advantage in time-sensitive missions.

  • Versatile Utility: Combines bridge and ferry capabilities to address varied crossing needs with a single system.