The HZ Elevated Pontoon Bridge represents a cutting-edge river-crossing equipment designed to enable rapid transit for heavy machinery and vehicles across large and medium-sized rivers—even in challenging conditions with high-velocity currents. With its advanced technical performance meeting international standards, it delivers reliable, efficient river-crossing capabilities for critical operations.
As an innovative river-crossing solution, the HZ Elevated Pontoon Bridge addresses the challenge of moving heavy equipment and vehicles across waterways with strong currents. Unlike conventional river-crossing methods that are slow or limited by water conditions, this system combines speed, durability, and adaptability to provide a robust transit route. Its technical excellence positions it among the world’s leading river-crossing technologies, making it ideal for scenarios where timely, safe river crossing is mission-critical.
Roadway Width: 4.5m
Erection Time: 25min
Tracked Load: 60t
Axle Load: 13t
Operators Required: 26
Erection Time for Anchor Ferries: 15min
Operators for Anchor Ferries: 16
Erection Time for 100m Pontoon Bridge: 40min
Operators for 100m Pontoon Bridge: 36
Maximum Current Velocity Tolerance: 3.5m/s
Load Capacity: 120t
Full-load Speed: 12km/h
No-load Speed: 14km/h
Erection Time: 25min
Operators Required: 26
What sets the HZ Elevated Pontoon Bridge apart as a premier river-crossing solution?
Rapid Deployment: Achieves full erection in as little as 25 minutes (floating bridge) and 40 minutes for a 100m span, minimizing operational delays.
High Load-Bearing Capacity: Supports tracked loads up to 60t (bridge) and 120t (ferry), accommodating heavy machinery, trucks, and equipment.
Strong Current Resistance: Operates efficiently in currents up to 3.5m/s, ensuring reliability in challenging river conditions.
Dual Functionality: Integrates both floating bridge and ferry capabilities, offering flexible crossing options for diverse operational needs.
Optimized Manpower Usage: Streamlined operations require as few as 16 operators (anchor ferries) to 36 operators (100m bridge), balancing efficiency with workforce requirements.
The HZ Elevated Pontoon Bridge is engineered for scenarios demanding rapid, reliable river crossing. Key use cases include:
Military Operations: Enabling swift movement of troops, armor, and supplies across waterways in dynamic environments.
Emergency Response: Facilitating disaster relief efforts by connecting communities separated by rivers during floods or crises.
Infrastructure Construction: Supporting large-scale projects (e.g., dam building, bridge construction) by providing temporary access across rivers.
Disaster Recovery: Restoring critical transit routes after natural disasters damage permanent bridges.
International-Grade Performance: Meets global technical standards, ensuring reliability and compatibility with international operations.
Adaptability to Extreme Conditions: Designed to function in high-velocity currents, making it suitable for diverse river environments worldwide.
Time-Efficient Operations: Rapid erection minimizes downtime, a critical advantage in time-sensitive missions.
Versatile Utility: Combines bridge and ferry capabilities to address varied crossing needs with a single system.