HZ51 Mechanized Fast Bridge
The HZ51 Mechanized Fast Bridge is a high-efficiency emergency obstacle-crossing system designed to ensure rapid passage of vehicles and personnel over obstacles within 49 meters in emergency scenarios. It operates with full mechanization, featuring a modular composition (1 Launching Vehicle, 6 Bridge Transporters, 1 Support Vehicle) that enables flexible span adaptation (17m, 25.5m, 34m, 42.5m, 51m) and strong load-bearing capacity (60t tracked load). With an erection/retrieval time of 90 minutes and only 6 operators required, it provides a reliable, fast solution for restoring mobility in emergency situations such as disaster relief, military maneuvers, or temporary engineering needs.