TO SERVE AS A SOLID FOUNDATION FOR GLOBAL CUSTOMERS'
MILITARY AND LOGISTICAL SUPPORT OPERATIONS DEMANDS

HZ25 Mountainous Plateau Accompany Bridge

The HZ Emergency Heavy Mechanized Railway Platform is a professional emergency railway equipment designed for loading and unloading heavy wheeled equipment when fixed railway platforms are unavailable or damaged. It features three core autonomous capabilities: self-erection, self-retrieval, and self-movement, enabling rapid response to railway transportation emergencies. Composed of 2 erection vehicles and 1 transporter vehicle, the platform boasts a 54m full-set roadway length, 50t tracked load capacity, and can be fully erected in 60 minutes by 6 operators—playing a critical role in emergency railway transport guarantees. Notably, it participated in the Military Parade of the 70th Anniversary of the People’s Republic of China, verifying its reliability and strategic value.
Inquiry
Detail

2.1 Core Value: Solving Emergency Railway Loading/Unloading Pain Points

The HZ Emergency Heavy Mechanized Railway Platform addresses key challenges in emergency railway operations, focusing on speed, autonomy, and heavy-load capability:

  • No Reliance on Fixed Platforms: Eliminates dependence on damaged or non-existent fixed railway platforms, ensuring heavy wheeled equipment (e.g., military vehicles, engineering machinery) can still be loaded/unloaded during emergencies.

  • Rapid Emergency Response: With 8-minute erection time for a single erection vehicle and 60-minute full-set deployment, it significantly shortens the response cycle of emergency railway transport, supporting time-sensitive missions (e.g., disaster rescue, military deployment).

  • Full Autonomy: Features self-erection, self-retrieval, and self-movement—no external lifting or traction equipment is required, making it suitable for remote or disaster-hit areas where infrastructure is limited.

  • Heavy-Load Adaptability: Boasts a 50t tracked load and 17t axle load, capable of handling heavy wheeled equipment (e.g., armored vehicles, large engineering trucks), meeting both military and civil emergency transport needs.

2.2 Key Features

  • Integrated System Design: The whole set consists of 2 erection vehicles and 1 transporter vehicle, with modular collaboration that ensures efficient loading/unloading—each erection vehicle provides a 14m roadway, and the full set forms a 54m continuous roadway (4m width) to accommodate long or multiple heavy equipment.

  • Ultra-Fast Erection: A single erection vehicle can be erected in just 8 minutes (operated by 2 people), and the entire system is fully deployable in 60 minutes (operated by 6 people), far outpacing traditional temporary platform solutions.

  • Strong Mobility of Erection Vehicles: Each erection vehicle has a curb weight of 38t, a maximum speed of 78km/h, and excellent off-road performance (42% max gradability, 27m min turning diameter, 27° approach angle, 23° departure angle), enabling quick movement between emergency sites.

  • High Load-Bearing Capacity: With a 50t tracked load and 17t axle load, it can safely support heavy wheeled equipment, ensuring stable loading/unloading even for large military or engineering vehicles.

  • Proven Reliability: As a participant in the Military Parade of the 70th Anniversary of the People’s Republic of China, its performance and durability have been rigorously tested in high-stakes scenarios, ensuring trustworthiness in emergency situations.

2.3 Technical Specifications

2.3.1 Overall System

  • Composition: 2 Erection Vehicles + 1 Transporter Vehicle

  • Curb Weight: 50t

  • Dimension (Length × Width × Height): 13m × 3.2m × 3.52m

  • Roadway Length (Single Erection Vehicle): 14m

  • Roadway Length (Whole Set): 54m

  • Roadway Width: 4m

  • Tracked Load: 50t

  • Axle Load: 17t

  • Erection Time (Single Erection Vehicle): 8 minutes

  • Erection Time (Whole Set): 60 minutes

  • Operators (Single Erection Vehicle): 2 personnel

  • Operators (Whole Set): 6 personnel

2.3.2 Erection Vehicle

  • Curb Weight: 38t

  • Dimension (Length × Width × Height): 13m × 3.2m × 3.2m

  • Max. Speed: 78km/h

  • Max. Gradability: 42%

  • Min. Turning Diameter: 27m

  • Approach Angle: 27°

  • Departure Angle: 23°

2.4 Application Scenarios

  • Emergency Railway Transport: When fixed railway platforms are damaged by natural disasters (earthquakes, floods) or man-made incidents, it enables rapid loading/unloading of heavy rescue equipment (e.g., engineering cranes, disaster relief vehicles) to support on-site rescue.

  • Military Equipment Deployment: Facilitates quick transfer of heavy military wheeled equipment (e.g., armored vehicles, missile launchers) via railways in wartime or emergency missions, ensuring rapid troop and equipment maneuvering.

  • Railway Infrastructure Maintenance: Serves as a temporary platform during railway construction or fixed platform maintenance, allowing heavy maintenance machinery to be loaded/unloaded without disrupting normal railway operations.

  • Remote Area Logistics Support: In remote regions with underdeveloped fixed railway infrastructure, it provides a mobile loading/unloading solution for heavy supplies (e.g., mining equipment, large agricultural machinery), supporting local economic construction.

  • National Defense & Parade Missions: As proven by its participation in the 70th National Day Military Parade, it is a key equipment for high-standard national defense demonstrations and emergency preparedness.