2.1 Core Product Value: Solving the Pain Points of "Fast Bridge Construction, Flexible Adaptation, and Controllable Costs"
Emergency Scenarios: When roads are interrupted after natural disasters (floods, earthquakes), temporary access can be quickly erected to ensure the transportation of rescue materials and the evacuation of personnel.
Engineering Scenarios: When temporary traffic across rivers or ditches is required during infrastructure construction, it shortens the construction period and avoids affecting project progress.
Long-Term Adaptation: It supports semi-permanent use. For remote areas, temporary settlements, etc., it can replace traditional long-cycle bridges and reduce construction costs.
2.2 Core Features: Multi-Dimensional Advantages Driven by Modular Design
Modular Structure: Components are produced in a standardized manner, facilitating transportation and requiring no complex on-site processing. This significantly shortens the erection time (reducing construction time by more than 50% compared to traditional bridges).
High Reusability and Interchangeability: Bridge components can be disassembled and reused multiple times, and some accessories of different models are universal, reducing later maintenance and secondary construction costs.
Flexible Adaptability: The structure can be customized according to span (6-87.6m) and load (20t-60t) requirements, supporting single-lane (4.2m) and dual-lane (7.35m) designs.
Stability and Durability: Mainstream models (CB200/CB200A/CB250) adopt steel decks, which have strong load-bearing performance and are compatible with various engineering load standards such as HL93 and HS25-44.
2.3 Detailed Technical Specifications
Model CB100:
Designed Span: 6-60m
Designed Load: HS25-44, Axle Load 20t, Tacked Load 50t
Dimension (Length × Width): 1.448×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck, Wooden Deck
Model CB200:
Designed Span: 6-54m
Designed Load: HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.134×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Model CB200A:
Designed Span: 6-60m
Designed Load: HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.134×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Model CB250:
Designed Span: 35-87.6m
Designed Load: HS20-44, HS25-44, HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.4×5.84m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
2.4 Application Scenarios
Emergency Rescue: Quickly restore traffic access after disasters such as earthquakes, floods, and mudslides.
Engineering Construction: Build temporary construction access or detour roads during highway/railway construction and water conservancy projects.
Remote Areas: Construct semi-permanent traffic bridges in areas with inconvenient transportation such as rural areas, mining areas, and scenic spots.
Temporary Events: Add temporary cross-road access for large-scale events such as competitions and exhibitions.