Military Scenarios: For military operations or training, the CB300 model can quickly build temporary bridges to ensure artillery and vehicles pass through obstacles, supporting timely troop maneuvering and equipment deployment.
Emergency Scenarios: After natural disasters (floods, earthquakes) causing road interruptions, all models (including CB300) can rapidly erect temporary access to guarantee the transportation of rescue materials and personnel evacuation; the CB300’s fast disassembling feature also facilitates post-disaster site clearance.
Engineering Scenarios: During infrastructure construction (highways, railways, water conservancy), the series (especially CB300 with 6-72m span) meets temporary cross-river/ditch traffic needs, shortening construction cycles and avoiding project delays.
Long-Term Adaptation: All models support semi-permanent use; for remote areas, temporary settlements, or military temporary positions, they can replace traditional long-cycle bridges, reducing construction and maintenance costs.
Modular & Standardized Structure: All components (including CB300’s panels) are standardized for production, with the CB300’s panel dimension of 2.28m × 3m (Length × Width × Height) enabling easy stacking and transportation. On-site construction requires no complex processing, and the CB300’s fast launching/disassembling feature further shortens the erection cycle (comparable to other models in the series, reducing over 50% of construction time vs. traditional bridges).
High Reusability & Wide Compatibility: Bridge components of the series (including CB300) can be disassembled and reused multiple times; the CB300 shares consistent carriageway widths (4.2m single lane / 7.35m double lane) with other models, ensuring partial accessory universality and lowering later maintenance costs.
Flexible Adaptability to Scenarios: The series covers spans from 6m to 87.6m (CB300: 6m-72m) and load capacities up to 60t (CB300: HL93, HA, HB, Tacked Load 60t), supporting both single-lane and dual-lane designs. The CB300’s dual military-civil application capability further expands its scenario coverage.
Stability & Durability: Mainstream models (including CB200/CB200A/CB250/CB300) adopt steel decks, ensuring strong load-bearing performance and compatibility with international load standards such as HL93 and HS25-44, suitable for long-term semi-permanent use.
Model CB100:
Designed Span: 6-60m
Designed Load: HS25-44, Axle Load 20t, Tacked Load 50t
Dimension (Length × Width): 1.448×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck, Wooden Deck
Model CB200:
Designed Span: 6-54m
Designed Load: HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.134×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Model CB200A:
Designed Span: 6-60m
Designed Load: HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.134×3.048m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Model CB250:
Designed Span: 35-87.6m
Designed Load: HS20-44, HS25-44, HL93, HA, HB, Tacked Load 60t
Dimension (Length × Width): 2.4×5.84m
Carriageway Width (Single/Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Model CB300:
Designed Span: 6m to 72m
Designed Load: HL93, HA, HB, Tacked Load 60t
Panel Dimension (Length × Width × Height): 2.28m × 3m
Carriageway Width (Single Lane / Double Lane): 4.2m / 7.35m
Deck Type: Steel Deck
Military Operations: The CB300 model supports military temporary bridge construction, ensuring artillery and vehicles pass through obstacles, and adapting to rapid troop maneuvering needs.
Emergency Rescue: All models (including CB300) quickly restore traffic access after disasters such as earthquakes, floods, and mudslides, guaranteeing rescue material transportation.
Engineering Construction: Suitable for highway/railway construction and water conservancy projects; the CB300’s 6-72m span meets most temporary cross-obstacle traffic needs.
Remote Areas & Temporary Settlements: All models support semi-permanent use, replacing traditional long-cycle bridges to reduce construction costs in rural areas, mining areas, and scenic spots.
Temporary Events: Provides temporary cross-road access for large-scale competitions, exhibitions, and other events, with fast erection and disassembling to avoid affecting normal traffic.